Task
On a large construction site, deviations from the design are found by technical-supervision engineers: it is expensive, slow and subjective. Checking against the BIM model took 2-3 days and held up the acceptance of stages, while the bank tranches depended on an objective readiness figure.
- shorten the cycle of control and BIM comparison
- give the bank an objective readiness figure
- stop arguing with contractors by eye
- cover safety control
- not stop the work on site during surveys